Making good is where the new work meets the old house, and it is the most under-specified line in most renovation quotes. Here is what it covers, why it is harder than it looks, and how to define it before work starts.
Making good is the work of returning surfaces and finishes disturbed by construction to an acceptable condition — patching walls and ceilings, matching cornices and skirtings, repairing floors at junctions, and resolving where new work meets old. On a renovation it is where two buildings of different ages have to be reconciled, and it is routinely underestimated by everyone involved.
The term appears in almost every renovation quote, usually as a single line, and it covers a category of work that can be trivial or genuinely difficult depending on the house. That range is the problem. Make good is a description of an outcome, not a specification of the work required to reach it — which means two people can read the same line and picture very different results.
None of this is anyone acting in bad faith. It is a term of art that has been carried into contracts with homeowners who reasonably read it as a promise of invisibility.
It concentrates at boundaries — anywhere the scope of works stops and the existing house continues.
Making good on a five-year-old house is mostly patching. On a fifty- or hundred-year-old house it is a matching exercise, and matching is a different discipline.
Profiles are discontinued. Cornice, skirting and architrave profiles from earlier eras are frequently no longer stocked. Matching them means either sourcing salvage or having a custom knife cut and the moulding run to order — which is both a cost and a lead time.
Materials are not equivalent. Lath and plaster does not sit at the same thickness as modern plasterboard, so a patch in an old wall involves packing, not just filling. Old floorboards vary in width, species and thickness from anything currently milled.
Nothing is straight. Old houses move. Floors fall, walls bow and ceilings sag, and a new element built dead level against them makes the discrepancy more visible rather than less.
Paint has aged. Even a colour matched from the original tin will not match a wall that has had ten years of light on it. A patched wall usually needs painting corner to corner, not spot-touched — and often the whole room, if the ceiling line is involved.
None of this makes the work impossible. It makes it work with a real scope, which is exactly why it deserves better than one line.
Written as make good all disturbed areas, the line leaves three things undefined: how far the making good extends, to what standard, and whether finishing is included.
Consider a removed wall in an older house. Making good could reasonably mean patching the ceiling and floor and leaving them ready for finishing. It could mean patching, matching the cornice profile, replacing floorboards in matching species, and painting the ceiling from wall to wall. It could mean painting the entire room so the result reads as one surface. All three are defensible readings of the same words, and they are very different quantities of work.
The fix is not suspicion. It is specificity — and specificity benefits the tradesperson at least as much as the homeowner, because a scope everyone agreed on in writing is one nobody has to negotiate at handover.
Usually in some form, but the extent varies widely. Rather than asking whether it is included, ask what specifically is included — the difference between those two questions is where the disagreements live.
Whoever the contract says. On a builder-managed job it generally sits with the builder, who coordinates the trades involved. Where you have engaged trades directly, making good can fall between them, since the damage is often caused by one trade and repaired by another. Name the responsible party for each item.
In new plasterboard, with the wall painted corner to corner afterwards, usually yes. In lath and plaster, in textured ceilings, or where the surrounding paint has aged, a genuinely invisible repair is difficult. Setting that expectation before the work is far better than discovering it after.
Not automatically, and this is worth confirming in writing. Preparing a surface ready for paint and actually painting it are different scopes, and both are legitimate ways to write the line.
There will be a gap the width of the old wall plate, and often a change in board direction or colour where the floor was never exposed to light. The options are weaving in matching boards, replacing the floor in that room, or making a feature of a threshold. All three are valid; the one that is not is leaving it to be decided on the day.
Making good is the last thing done and the first thing noticed, which makes it worth resolving long before it arrives.
Read next: what order trades come in on a renovation, to see where making good sits in the sequence, or why renovations run late if the finishing stages are dragging. Or start at Renovations & Extensions for the wider picture.
Home Collab publishes the working detail behind building and renovating in Australia — written from job experience, updated as methods and regulations move, and free to read.
August 15, 2026